Education:
Architectural Association School of Architecture 1984 to 1987- completed the Royal Institute of British Architects Part 1 (1987 High Pass)
Arup Internship 1987-1989
Architectural Association School of Architecture 1990 to 1993- completed Diploma of Architecture and Royal Institute of British Architect Part 2 (examined by John Pringle & Ingrid Morris) in July of 1993.
University of Bath in October 1995- completed Royal Institute of British Architects Part 3
Certifications:
RIBA Chartered Member- 1998 elected into corporate membership of The RIBA.
CSI Member
KEY PROJECTS:
BIM PROJECTS:
Pharma GMP Facility (CD)
Highrise Laboratory (DD)
Zymogenetics Lab (CD)
PS24 QUEENS (CD)
PS111 QUEENS (DD CD CA)
PS029 QUEENS (DD CD CA)
PS109 BRONX (SD DD CD)
PS113 BRONX (SD DD CD)
PS145 BRONX (CD)
IS071 BROOKLYN (DD CD)
MS282 BROOKLYN (SD DD)
OTHER TECHNICAL BUILDINGS:
PROJECTS DESIGNED BY JBM
JBM ACADEMIC PROJECTS
ARUP: 1987-1989
Goodwood Equestrian Grandstand- Drafter/ Intern Architect
Imperial War Museum- Drafter/ Intern Architect
Royal Life Insurance- Drafter/ Intern Architect
Triton Square Development- Schematic Designer/ Intern Architect
Closegate Hotel- Drafter/ Intern Architect
Emerald Street Redevelopment- Schematic Designer/ Intern Architect
HELIX STUDIO: 1990-1991
British Rail- Crystal Palace Low Level Station- Sole Practitioner/ Historic Preservation
Redevelopment of British Rail- Crystal Palace Low Level Station/ Schematic Design
DEVEREUX ARCHITECTS: 1993-1994
A Functional Brain Imaging Laboratory- Apprentice Architect/ Assistant Technical Architect
LONDON UNDERGROUND: 1995
Architecture and Station Design of Jubilee Line- Designer of Selective Services Distribution System
NBBJ: 1995-1998
University of Rochester Medical Center Ambulatory Care Facility- Assistant Architect
Swedish Hospital Phase 5 Surgery- Assistant Architect (Interior Elevations of Surgery Suites)
Shanghai American School- Assistant Architect
Presbyterian Hospital, Albuquerque- Assistant Architect
Corrections Center- Master planner, Site Architect and Medical Center Architect
Reebok World Headquarters- Assistant Architect (Parking Structures)
MBT ARCHITECTURE: 1998-2001
South Lake Union Technology Center- Laboratory Architect
Seattle Based Research Laboratory- Laboratory Architect (BIM)
Stanford University College of Mechanical Engineering- Combustion Science Laboratory Architect (BIM)
Pharmaceutical Pilot Plant- Project Architect
Seattle Highrise Lab- Project Architect
MCCLELLAN COPENHAGEN: 2001-2002
University of California Riverside Biological Sciences Laboratories- Lab Planner
Washington State University Agricultural Sciences Research Laboratories- Lab Planner
Center for Disease Control Laboratory for Bovine Spongiform Encephalopathy- Lab Planner
SOLAR PHOTOVOLTAIC PROJECTS/ ROLES
TURTLE & HUGHES, INC: 2002-2011 (TURTLE ENERGY SOLAR PROJECTS)
6.0 MW Lawrenceville, New Jersey MV Behind Meter Solar Electric Farm
32 KW Clarion, Pennsylvania LV Behind Meter Roof Mounted Solar Electric Project
60 KW Randolf, Massachusetts LV Behind Meter Roof Mounted Solar Electic Project
30 KW Dedham, Massachusetts LV Behind-Meter Roof Mounted Solar Electric Project
140kW Wayne, New Jersey LV Behind Meter Roof Mounted Solar Electric Project
55 KW West Orange, , New Jersey LV Behind Meter Roof Mounted Solar Electric Project
60 KW Millburn, New Jersey LV Behind Meter Roof Mounted Solar Electric Project
3 KW , Hoboken, New Jersey LV Behind Meter Roof Mounted Solar Electric Project
7kW New Sweden, New Jersey LV Behind Meter Ground Mounted Solar Electric Project
7KW Palmyra, New Jersey LV Behind Meter Roof Mounted Solar Electric Project
10KW Lebanon, New Jersey LV Behind Meter Roof Mounted Solar Electric Project
175 KW, Bordentown, New Jersey LV Behind Meter Roof Mounted Solar Electric Project
175 KW Montclair, New Jersey LV Behind Meter Roof Mounted Solar Electric Project
135 KW Kearny, New Jersey LV Behind Meter Roof Mounted Solar Electric Project
135KW Kearny, New Jersey LV Behind Meter Roof Mounted Solar Electric Project
150 KW Kearny, New Jersey LV Behind Meter Roof Mounted Solar Electric Project
75 KW Kearny, New Jersey LV Behind Meter Roof Mounted Solar Electric Project
10 KW , Hoboken, New Jersey LV Behind Meter Roof Mounted Solar Electric Project
102 KW Trenton, New Jersey LV Behind Meter Roof Mounted Solar Electric Project
175kW Red Bluff, California LV Behind-Meter, Roof-Mounted, Solar Electric Project
175 KW Millville, New Jersey LV Behind-Meter, Roof-Mounted, Solar Electric Project
28 KW Neptune, New Jersey LV Behind-Meter, Roof-Mounted, Solar Electric Project
50 KW Newark, New Jersey LV Behind-Meter, Roof-Mounted, Solar Electric Project
112 KW East Hanover, New Jersey LV Roof Mounted Solar Electric Project
175 KW Paramus, New Jersey LV Behind-Meter Roof Mounted Solar Electric Project
240 KW Eatontown, New Jersey LV Behind-Meter Roof Mounted Solar Electric Project
175 KW Trenton, New Jersey LV Behind Meter Roof Mounted Solar Electric Project
700 KW Port Elizabeth, PANYNJ, New Jersey LV Building Integrated Roof mounted PV laminate project
MARTIFER SOLAR: 2012-2013
1.3 MW Maynard, Massachusetts MV Grid Direct Solar Electric Landfill Project
400 KW Brookfield, Massachusetts MV Grid Direct Solar Electric Landfill Project
3.4 MW Southbridge, Massachusetts MV Grid Direct Solar Electric Farm
2.4 MW Orange, Massachusetts MV Grid Direct Solar Electric Landfill Project
INENERGY LLC: 2012-2013
230kW Harry S Fisher Elementary School (Behind Meter) Roof Mount
270kW Ely J Terry Middle School (Behind the Meter) Roof Mount
713kW - 1.3MW Terryville High School (Behind Meter) Solar Electric Farm
PHOSENERGY LLC: 2011-2015
128 MW Spur, Texas HV Grid Direct Solar Electric Farm
Executed 1MW Power Purchase Agreement between Safari Energy/ Plymouth Ct.
Prepared numerous solar proposals for customer generators in Connecticut.
Designed solar project for Pt. Baptiste in Dominica, Leeward Islands W.I.
MASSA MULTIMEDIA ARCHTECTURE: JULY15, 2015- JULY 15, 2019
(ALL PROJECTS CARRIED OUT USING REVIT 2014 TO 2020)
$68mm Newly Constructed Addition to PS24 Queens, NY (CD Phase)
$5mm Captl Imprvmnt to PS111 Queens NY, (SD, DD, CD, CA Phases)
$10 mm Captl Imprvmnt to PS113 Bronx NY, (SD, DD, CD, CA Phases)
$1mm Captl Imprvmnt to PS109 Bronx NY, (SD, DD, CD, CA Phases)
$6mm Captl Imprvmnt to PS029 Queens NY, (SD, DD, CD, CA Phases)
$4mm Captl Imprvmnt to IS071 Brooklyn NY, (SD, DD, CD Phases)
$7mm ADA Improvement to MS282 Brooklyn NY, (SD, DD Phases)
$3mm School Based Health Clinic to IS145 Bronx NY (DD, CD, CA)
$5mm Captl Imprvmnt to Target Retail Manhattan NY (CD, CA)
Key accomplishments to date:
I moved to England for eleven years in 1984, enrolled at England's oldest architecture school and joined the Royal Institute of British Architects as a student member in 1985.
When I completed the Royal Institute of British Architects Part 1 (1987 High Pass) & RIBA Part 2 (1993) examinations I was also awarded the AA Diploma by The Architectural Association School of Architecture, in London during this period.
I married in 1986, and remain married to the same partner to this day having raised three children since 1991.
My initial working career began in 1987 during my internship with Ove Arup & Partners in London.
I certified RIBA Part 3 with ARCUK Registration (061069K) completed at University of Bath in October 1995.
Practiced in England from 1984 to 1995 with Laboratory and Healthcare based practices.
My first role as project architect was found in 1993 on New Neuroscience Research Lab in London.
Keen to live in The Pacific Northwest, I returned to USA in 1995 and authored concept for $160mm Corrections Project for NBBJ & State of Wa. Completed multi-phase role responsible for planning and design/ documentation of multi-custody infirmary.
I had a supporting Architect Role on Reebok World Headquarters in 1997 with NBBJ Reebok Team- SD Phase to Construction Documentation- solely responsible for parking structures worth 18% of total construction budget.
Project Architect/ Lab Planner Role at Stanford University, University of Washington, and Zymogenetics while with MBT Architecture.
Project Architect on Good Manufacturing Practices (GMP) Facility for Pfizer Pilot Plant using BIM.
Lab Planner roles at Millennium Pharmaceuticals, The University of California in Riverside (UCR Biological Sciences) and the Center for Disease Control in Georgia yielded direct experience with lab scientists while employed by AHSC McClellan Copenhagen.
In 2004, I collaborated with Gwathmey Siegel & Associates Architects llc, and was solely responsible for the design, supply, construction management, commissioning and monitoring of a 50kW Photovoltaic System for New Jersey Institute of Technology.
I won a $2mm public bid to design, supply, construction manage, commission and monitor 500kW of Schott Solar Photovoltaic Systems at four schools in Kearny, NJ in 2005 which produce 585MWh per year.
The Port Authority of New York & New Jersey's first solar PV project was designed, supplied, construction managed, commissioned and monitored by my company, TurtleEnergy LLC in 2006.
By 2006, I had Founded Turtle Energy LLC, a renewable energy system integration company and successfully grew the company to generate $11MM in sales and $1.6MM in margin after just 3 years.
I have been soley responsible for many solar energy systems through a novel strategic business plan- selling, marketing, designing and maintaining solar energy systems capable of powering entire buildings and campuses with leading edge technological innovation. This plan positioned my firm for third party finance of photovoltaic systems from which building owners would only have to buy discount electricity from these investor owned systems that culminated with the design and construction of a $28mm solar project at The Lawrenceville School that produces 100% of the 9500MWh annual electricity consumption by the school.
Education
John Millard attended the Architectural Association School of Architecture from 1984 to 1987 (under Peter Salter & Pascal Schoning) when he completed The Royal Institute of British Architects Part 1 Exam (Examined by Peter Rice and Christoff Langhoff)
Internship with Arup Associates from 1987 until 1989 yielded significant multi-disciplinary design experience with Arup-in house structural, electrical and mechanical engineering support for the team of architects leading projects such as Goodwood Equestrian Grandstand (Sussex), Imperial War Museum (London), Royal Life Insurance (Peterborough), Triton Square Development (London), Closegate Hotel (Newcastle), Emerald Street Redevelopment (London) and Paternoster Square (London). Note: earliest use of CAD during this internship using GDS by McDonnell Douglas and BIM though live multidisciplinary coordination.
John spent a further three years from 1990 to 1993 in the Diploma School at The Architectural Association School of Architecture (under Peter Salter, Jeanne Sillet & Mike Gold), earning both the AA Diploma of Architecture and passing the Royal Institute of British Architects Part 2 examination (examined by John Pringle & Ingrid Morris) in July of 1993.
Finally in 1995, after completing apprenticeship at Devereux Partnership designing A Functional Brain Imaging Laboratory Case Study for RIBA Part 3- I prepared for and completed the Royal Institute of British Architecture Part III examination at University of Bath. During this time I was employed by London Underground working on the Jubilee Line Extension designing the Selective Services Distribution System while on the Components Team. Later in 1998, I was elected into corporate membership of The RIBA.
Experience Timeline and Roles
Arup Associates, London (Jun. 1987 - Sep. 1989) Intern Architect
Devereux Architects, London (Aug. 1993 - Sep. 1994) Project Architect
London Underground, London (Sep. 1994 - Sep. 1995) Technical Architect
NBBJ, Seattle (Nov. 1995 - Jul. 1998) Assistant Architect
MBT, Seattle (Aug. 1998 - Jul. 2001) Project Architect
McClellan Copenhagen, Seattle (Jul. 2001 - Sep. 2002) Laboratory Architect/ Planner
Turtle & Hughes, Inc., Linden NJ (Sep. 2002 - Jan. 2011) Company Founder of TurtleEnergy
Martifer Solar, Los Angeles CA. (Nov. 2012 - Mar. 2013) Vice President of Operations
InEnergy, Inc., Ringoes NJ (Mar. 2013 - Jun. 2014) Chief Operating Officer
PhosEnergy LLC., Manasquan NJ (Jan. 2011 - Jul. 2015) Company Founder/ Project Developer
Massa Multimedia Architecture, Neptune, NJ (Jul. 2015 - July 2019) Project Manager
Architectural Projects/ Roles/ TOOLS MASTERED
Arup: 1987-1989 (APPRENTICE ARCHITECT)
Goodwood Equestrian Grandstand- Drafter/ Intern Architect/ GDS Computer Aided Design
Imperial War Museum- Drafter/ Intern Architect/ GDS Computer Aided Design
Royal Life Insurance- Drafter/ Intern Architect/ GDS Computer Aided Design
Triton Square Development- Schematic Designer/ Intern Architect/ GDS Computer Aided Design
Closegate Hotel- Schematic Designer/ Intern Architect/ GDS Computer Aided Design
Emerald Street Redevelopment- Schematic Designer/ Intern Architect/ GDS Computer Aided Design
Helix Studio: 1990-1991 (APPRENTICE ARCHITECT)
British Rail- Crystal Palace Low Level Station- Sole Practitioner/ Historic Preservation/ Measured Drawings
Redevelopment of Crystal Palace Low Level Station into a Mixed Use Office/ Transport Museum- Sole Practitioner/ Client Manager
Devereux Architects: 1993-1994 (APPRENTICE ARCHITECT)
A Functional Brain Imaging Laboratory- Project Architect/ Assistant Technical Architect/ Client Manager of Neuro-Scientists
London Underground: 1995 (ARCHITECT)
Architecture and Station Design of Jubilee Line- Designer of Selective Services Distribution System/ Industrial Design/ Microstation, 3D Studio
NBBJ: 1995-1998 (ARCHITECT)
University of Rochester Medical Center Ambulatory Care Facility- Assistant Architect/ Autocad R11, MS Office
Swedish Hospital Phase 5 Surgery- Assistant Architect (Interior Elevations of Surgery Suites)/ Autocad R11, MS Office
Shanghai American School- Assistant Architect/ Construction Drawings/ Autocad R11
Presbyterian Hospital, Albuquerque- Assistant Architect/ Design Development/ Autocad R11, 3D Studio
Corrections Center- Master planner, Site Architect and Medical Center Architect/ Client Management/ Planning/ Autocad R11, MS Office
Reebok World Headquarters- Assistant Architect (Parking Structures- Schematic Design to Construction Documents)/ Autocad R11
MBT Architecture: 1998-2001
South Lake Union Technology Center- Laboratory Architect (Schematic Design/ Feasibility Study)/ Architectural Desktop R3
Seattle Based Research Laboratory- Laboratory Architect- SD (BIM) / Architectural Desktop R3, Adobe Pagemaker, Photoshop, MS Office
Institute for Mind Brain and Learning- (Schematic Design/ Feasibility Study)/ Architectural Desktop R3, 3D Studio VIZ, Adobe Pagemaker, Photoshop
Stanford University College of Mechanical Engineering- Combustion Science Lab Architect- SD, DD, CD (BIM)/ Architectural Desktop R3, 3D Studio VIZ
Pharmaceutical Pilot Plant- Project Architect- SD, DD, CD (BIM)/ Architectural Desktop R3, 3D Studio VIZ, MS Office
Seattle Highrise Lab- Project Architect- SD, DD, CD (BIM)/ Architectural Desktop R3, 3D Studio VIZ, Adobe Pagemaker, Photoshop
McClellan Copenhagen: 2001-2002
University of California Riverside Biological Sciences Laboratories- Lab Planner/ Architectural Desktop R3
Washington State University Agricultural Sciences Research Laboratories- Lab Planner/ Architectural Desktop R3, MS Office
Center for Disease Control Laboratory for Bovine Spongiform Encephalopathy- Lab Planner/ Architectural Desktop R3, MS Office
Turtle & Hughes, Inc: 2002-2011 (Founded Solar Division TurtleEnergy llc)
Solar Projects:
6.0 MW Lawrenceville, New Jersey MV Behind Meter Solar Electric Farm/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
32 KW Clarion, Pennsylvania LV Behind Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
60 KW Randolf, Massachusetts LV Behind Meter Roof Mounted Solar Electic Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
30 KW Dedham, Massachusetts LV Behind-Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
140kW Wayne, New Jersey LV Behind Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
55 KW West Orange, , New Jersey LV Behind Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst
60 KW Millburn, New Jersey LV Behind Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
3 KW , Hoboken, New Jersey LV Behind Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
7kW New Sweden, New Jersey LV Behind Meter Ground Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV SST
7KW Palmyra, New Jersey LV Behind Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
10KW Lebanon, New Jersey LV Behind Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
175 KW, Bordentown, New Jersey LV Behind Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst
175 KW Montclair, New Jersey LV Behind Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
135 KW Kearny, New Jersey LV Behind Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
135KW Kearny, New Jersey LV Behind Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
150 KW Kearny, New Jersey LV Behind Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
75 KW Kearny, New Jersey LV Behind Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
10 KW , Hoboken, New Jersey LV Behind Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
102 KW Trenton, New Jersey LV Behind Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
175kW Red Bluff, California LV Behind-Meter, Roof-Mounted, Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
175 KW Millville, New Jersey LV Behind-Meter, Roof-Mounted, Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
28 KW Neptune, New Jersey LV Behind-Meter, Roof-Mounted, Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
50 KW Newark, New Jersey LV Behind-Meter, Roof-Mounted, Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
112 KW East Hanover, New Jersey LV Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
175 KW Paramus, New Jersey LV Behind-Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
240 KW Eatontown, New Jersey LV Behind-Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
175 KW Trenton, New Jersey LV Behind Meter Roof Mounted Solar Electric Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
700 KW Port Elizabeth, PANYNJ, New Jersey LV Building Integrated Roof mounted PV laminate project
Martifer Solar: 2012-2013 (PROJECT MANAGER)
1.3 MW Maynard, Massachusetts MV Grid Direct Solar Electric Landfill Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
400 KW Brookfield, Massachusetts MV Grid Direct Solar Electric Landfill Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
3.4 MW Southbridge, Massachusetts MV Grid Direct Solar Electric Farm/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
2.4 MW Orange, Massachusetts MV Grid Direct Solar Electric Landfill Project/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
InEnergy LLC: 2012-2014 (COO)
230kW Harry S Fisher Elementary School (Behind Meter) Roof Mount/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
230kW Plymouth Center School (Behind Meter) Roof Mount/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
270kW Ely J Terry Middle School (Behind the Meter) Roof Mount/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
713kW - 1.3MW Terryville High School (Behind Meter) Solar Electric Farm/ ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
PhosEnergy LLC: 2011-2015 (FOUNDING PARTNER)
128 MW Spur, Texas HV Grid Direct Solar Electric Farm- ADT 2005, Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5
Massa Multimedia Architecture: 2015 - 2019 (PROJECT MANAGER)
REVIT 2014 - 2020. Adobe Creative Suite, 3D Studio VIZ, MS Office, PV Syst v5